The project is a plantation based on assisted natural regeneration with 5,255 trees. The tree species are Corsican pines, lime trees, sycamore maples, and shrubs and fruit trees. The project starts in the planting season of 2022 - 2023.
The plot is along the road and is 2.5 hectares in total. It was formerly populated with neglected poplars and as...Read more
The project is a plantation based on assisted natural regeneration with 5,255 trees. The tree species are Corsican pines, lime trees, sycamore maples, and shrubs and fruit trees. The project starts in the planting season of 2022 - 2023.
The plot is along the road and is 2.5 hectares in total. It was formerly populated with neglected poplars and ash trees. The trees were decimated by rust and chalarose and the plot was abandoned for several years.
After removing the dead and dying trees, the planting will be in the following planting organization:
Center of the plot is planted with 4300 trees, primarily Corsican pine, then small-leaved lime and Norway maple.
A shrubby leafy edge on the periphery of the remaining trees: field maple, dogwood, hawthorn, rowan, hazel + one line of fruit trees for wildlife.
The planting is done in mixed islands.
Plantation updates:
- 5,255 trees planted. The centre of the plot holds 4,300 trees: 2,600 Corsican pines, 850 small-leaved limes, and 850 Norway maples. The perimeter is bordered by 955 shrubs and fruit trees, including field maple, dogwood, hawthorn, rowan, and hazel, plus a row of fruit trees for wildlife.
- Monitoring in June 2026 estimated a 90% recovery rate, with the plot in good overall sanitary condition. No climatic damage was recorded.
- Roughly 10% of the trees show biotic damage, mainly from game and rodent activity. No fungal or insect related damage was observed.
- Replanting has already been carried out to replace lost Corsican pines. No further replanting is planned.
- Natural regeneration is present on site, oak, maple and birch, and will be retained.