The Isle la Hesse project, located in Bastogne, Belgium, aims to establish a visually impactful arboreal border between agricultural fields and the national road. Covering 0.3 hectares at an altitude of 550 meters, the plantation will consist of 825 trees, including a mix of arboreal and shrub species such as hawthorns, black elders, European rowan...Read more
The Isle la Hesse project, located in Bastogne, Belgium, aims to establish a visually impactful arboreal border between agricultural fields and the national road. Covering 0.3 hectares at an altitude of 550 meters, the plantation will consist of 825 trees, including a mix of arboreal and shrub species such as hawthorns, black elders, European rowans, alder buckthorn, bird cherry, European larches, yews, Douglas firs, Nordmann firs and silver firs.
The planting arrangement includes a single line of 250 shrubs followed by four lines of mixed conifers. The project contributes to biodiversity by creating an expanded forest edge that serves as a refuge for wildlife while enhancing the landscape’s natural aesthetics and tranquility. The reforestation effort is executed in the season of 2024-2025, with site preparation in October 2024. The planting process involves light soil preparation, with specific techniques including the use of low-pressure tires and game protection measures.
Historically, the site holds significance, as the Château de Isle la Hesse served as a nighttime headquarters for General McAuliffe during the Battle of the Ardennes in World War II.
Plantation updates:
- Planting date: The trees were planted from March 7 to March 9, 2025.
- 875 trees planted: The final plantation included a mix of native and coniferous species: 50 hawthorns, 50 black elders, 50 rowan trees, 50 alder buckthorns, 50 bird cherries, 50 European larches, 75 yews, 100 Douglas firs, 200 Nordmann firs, and 200 silver firs. This exceeds the initial plan of 825 trees, with increased numbers of Nordmann and silver firs.
- Monitoring summary: The planting was carried out under good weather conditions, with no issues reported. Tree quality and size were appropriate, and all planned species were available. The site, located in Bastogne and covering 0.3 hectares, was prepared by line milling on February 19. Planting was done in mixed lines by professional planters. No difficulties were encountered during the operation. A field visit in June 2026 confirmed that the trees continue to grow well.
- Maintenance: Clearing is planned to support the growth and health of the young trees.